Automation and Pumping Systems
We optimize your water delivery system.
Service Process
The equipment is embedded in the control room, then power supply wiring is done (from the switch side and the motor pump). A pressure sensor is installed (depending on the variable to be controlled).
The frequency drive is programmed to the customer’s needs, and finalization is done by conducting tests of operation and start-up.
Pre-requisites:
- Operating Voltage
- Horsepower (HP) Rating
- Transformer Capacity
- Variable to Control
Embedding
Input and Output Wiring
Programming
Startup and Commissioning
Contact Us!
We are ready to take on your project.
We are distributors
We are official distributors and installers in Mexico of the best brands, which allows us to offer you a warranty of up to 3 years on the equipment we provide for your water well